News & Events

Control System for Ulu Pandan Sludge Pre-treatment

26 April 2015
Singapore, April 2015A project being executed by United Engineers Pte Ltd, a company involved since the 1930s for many waterworks and water-related infrastructure. Today, the Group undertakes water-related and waste-to-energy projects on EPC (engineering, procurement and construction), DBO (design, build and operate) and BOT (build-operate-transfer) bases. This fast track project has been awarded to DNR for the Supply of control system and SCADA based on WINCC for the Germany manufactured Ultrasonic Sludge Pre-treatment Package system.
Archives